LHR on release wasn’t even complete, they didn’t even have the correct amount of jetbridges on each stand (still don’t I think, a good amount that are supposed to have 3 bridges only have 2)
Also lets not forget the hsbc logos that are supposed to be spammed all over the jetways. And also the model for the jetbridges themselves are wrong. I hope they revisit the airport like they are with SYD.
I mean that SCL will be in Q2, this “next airport” is not know (for us) airport.
It’s Q2 now, so the update might be out in a few days.
Almost everything is done, so you can be right.
3D view is still outdated, switch to 2d to see the new terminals
Google Earth 3D view is from a very long time ago so you can ignore it.
I just want to see the full SCL but, it was strange when I did not see the other terminals.
Go to google maps and check if [Layers] → [More] → [Globe View] is selected (at the bottom left panel).
Deselect it and you should be able to see 2D satellite images in which the new terminal is in place.
nevermind, I will just go to the historic view, that way, I can see the new terminals
Can i get a feel on domestic and international terminals?
Coming 2025-06-29T16:00:00Z
How do you know this?
I think that was in the devblog where it said it will arrive
But I must stress that may not reflect the actual time of release.
Just rebranded this as a 3.1 and SCL pre release discussion, turns out we didn’t actually have one other than this.
I think30th of june will be the release date. Devs like releasing updates on monday or tuesday