Please fill in all fields below to help us understand and resolve the issue effectively.
Platform:
Android
Game Version:
3.6.1
Airport:
GRU
Description of the Bug:
I Landed a TAAG Angola B743 at my GRU, I handled with full 13/13 crew + ramp agent but it’s estimated handling time was still red
Steps to Reproduce:
Don’t know how it’s possible to reproduce but it happened on my 3rd handling of the plane
In the devblog #30, kubasan wrote “Ambulift is triggered by a probability-based algorithm that simulates how many PRM (Passengers with Reduced Mobility) arrive or depart on a given flight. It’s not something you can predict — and yes, it can sometimes affect your ability to meet turnaround limits. However, you can still use the Deal Manager to “smooth out” those occasional overruns when needed.”
So I don’t think it’s a bug, just an annoying feature.
But then again it doesn’t really make sense to me that the B743 with the same amount of handlers and yet a theoretically (because of size and capacity) shorter handling time as the -400 runs into these issues, while the 744 doesn’t