The masterplan of new SAN T1, only the 19 gates on the right in this phase (you can see a line splits that in the middle). Seeming to be 1 E and 18 C gates? Donโt know about remote stands but could be 2 E?
4 Likes
Hereโs some pictures i got of the current development
7 Likes
Ha, I hope itโs 2 E gates. Iโd prefer not to give up the 4 D gates we get in current WOA T1, but it might not be so bad if we get 2 E gates
2 Likes
Judging from images, we will get quite a few new E gates, looks like around 6. Also WoA Devs are typically quite generous and give extra D/E/F stands if they fit in the area
4 Likes
Yep and some are shared stands but most of the E gates will be in the second phase unfortunately.
I assume if they were to include the new terminal it would be the whole thing, would save them spending extra time on taxi-ing routes for each individual phase, theyโve done it before with the new Muscat terminal
9 Likes
Well, remember this terminal is for the domestic flights already served by T1, which are only ever C and smallerโฆ so maybe it would open opportunity for domestic wide body? But for international itโd need a customs area like T2
4 Likes
Yeah i think delta use 767s to JFK quite often, and Hawaiian send 330s.
2 Likes