What is your suggestion?
Have shared stands share a schedule to optimize their use.
How would it work in the game?
Let’s say you schedule a 744 in stand 1. Stands 1A and 1B would get a ghost plane in the first slot so the 744 lands first. Then you put a 734 in Stand 1A. Stand 1 would get a ghost plane so the 734 always comes in second.
Why is this a good idea?
Even with the scheduler, shared stands are still problematic because once a stand is blocked, it pretty much won’t get used until the blocking stand runs out of planes. Sharing the schedule gives better control and reflects real world operations.
Optional: Image or reference
Attach anything that helps visualize or support your idea.